![Kval Edge-SS Скачать руководство пользователя страница 91](http://html.mh-extra.com/html/kval/edge-ss/edge-ss_operation-manual_2012829091.webp)
Initial Powering Operations for the Edge-SS
3-7
KVAL Operation Manual
Home the Machine Line
The Machine Line must go through a homing routine before any operations are performed. The
homing routine sets a zero reference from which each machine measures its movement and cut-
ting process.
If power is lost or any machine is reset, the homing routine must be performed again. Each
machine has a
Home
button on it’s associated
Main Control Screen
or the entire machine line can
be
Homed
using the
Home Machine Line
button located on the
Machine Line Screen
.
How to Power Down the Machine
.
Step 1
1.
Push the
Stop
button for each machine, located
on the Operator’s Station
2.
Exit or shutdown all open programs.
3.
Shut down the operating system, by selecting
Shutdown
from the Window’s Desktop.
Note:
Make sure Windows is shutdown com-
pletely before turning off the machine.
Hard drive or data may be damaged if not
turned off in this order.
4.
For each machine, switch the green
Control
Circuit
switches to the OFF position.
5.
also recommends that you turn the disconnect
switches on the electrical cabinets to OFF; this
helps reduce possible damage due to power
surges from electrical storms.
Step 2
Step 3
Step 4
Step 5
Содержание Edge-SS
Страница 4: ...KVAL Edge SS System Operation Manual ...
Страница 6: ...KVAL Edge SS System Operation Manual ...
Страница 12: ...KVAL Edge SS Manual Table of Contents ...
Страница 32: ...How to Download the Service Application KVAL Operation Manual 1 20 Page Intentionally Left Blank ...
Страница 49: ...About Revisions 2 16 KVAL Manual ...
Страница 84: ...Common Terms 2 51 KVAL Manual FIGURE 2 11 Example of a Validation Report ...
Страница 147: ...About the Nodes 5 21 KVAL Operation Manual ...
Страница 149: ...Index Kval Edge SS clean up 12 inspect 12 ...
Страница 150: ......
Страница 151: ......