![Kval 990-H Скачать руководство пользователя страница 42](http://html.mh-extra.com/html/kval/990-h/990-h_operation-manual_2012802042.webp)
5.
The screws are stacked
in the slots of the
Screw
Tracking Plate Assembly.
6.
The
Screw Tracking
Plate Assembly
moves
the
Screw Tracking Plate
Assembly.
to capture
screws six at a time.
About the Six Shooter System
2-13
KVAL 990-H Operation Manual
7.
Press
Screw Tracking Plate Assembly.
8.
On the Six Shooter Control panel to activate the Slide Assembly to drop the screws
into the
Screw Delivery Tubes.
9.
Each tube has air injectors to speed the delivery to the
Screw Receiver Tubes.
Quick Change Process
Some Six Shooter Systems have an a quick change option to quickly change to differ-
ent colored screws. To start the quick change process:
1.
Press the
Load
button on the
Touch Screen
.
The back section of the Hopper will cycle upward once to shift all the screws from
the back door to clear screws between the back door of the hopper and the slides.
2.
Once the Hopper is in the up position, the door will open and the Hopper will cycle
down quickly to throw the surplus of screws out the funnel container.
3.
Once in the back section is in the down position, the front section (
Screw Tracking
Assembly
) moves upward to drain the rest of the screws out of the hopper this will
cycle one more time to clear the screws from the slides.
4.
Press the
Reset
button on the Six Shooter panel located mid machine on the front
section.
5.
Fill the Hopper with new screws.
Содержание 990-H
Страница 4: ...KVAL 990 H Operation Manual ...
Страница 8: ...990 H Table of Contents ...
Страница 27: ...How to Download the Service Application 1 19 KVAL 990 H Operation Manual Page Intentionally Left Blank ...
Страница 29: ...Safety Sign Off Sheet 1 21 KVAL 990 H Operation Manual ...
Страница 83: ...Status of I O and E Stops Screen KVAL 990 H Operation Manual 2 54 ...
Страница 86: ......
Страница 87: ......