INSTALLATION
1. The Auto Charge LPC should be installed in a well ventilated area.
2. Mount the charger with the four holes provided.
WIRING
1. Refer to Installation Wiring Diagram.
2.
CAUTION: CONNECT DC WIRES TO CHARGER FIRST, THEN TO BATTERIES.
2. Terminate #2AWG or larger cable wire using 5/16" ring lugs, included in hardware
pack. Torque rating 15ft-lb max.
3. Install 100 amp circuit breaker using 5/16 ring lugs in line with BAT (+), included
in hardware pack.
Note: Circuit breaker should be placed closest to battery
terminal.
Torque rating 50in-lb max.
4. Double check all wiring before applying 240 AC volts to input terminal. Verify that
the battery voltage appears at the charger output terminals.
Note:
A minimum of
9 volts is required to start the charger.
5. Apply 240 VAC (shoreline power) to input terminal and observe that the charger
is operating. The Remote Bar Graph need not be connected for the charger to
operate.
Length of Wire to Battery (feet)
Battery Charger Connections
V. B
AT +
AU
X +
CO
M -
V. B
AT +
AU
X +
CO
M -
V. B
AT +
AU
X +
CO
M -
Wire # Gauge (awg)
2
12
2
2
12
2
2
12
2
0-5
5-10
10 - 20*
* Consult factory if length of wire to battery is longer than 20 feet