8
GB
INSTALLATION
Drilling the Ceiling/shelf and fixing the frame
DRILLING THE CEILING/SHELF
• Use a plumb line to mark the centre of the hob on the ceiling/support shelf.
• Place the drilling template 21 provided on the ceiling/support shelf, making sure that the template is
in the correct position by lining up the axes of the template with those of the hob.
• Mark the centres of the holes in the template.
• Drill the holes at the points marked:
• For concrete ceilings, drill for plugs appropriate to the screw size.
• For hollow brick ceilings with wall thickness of 20 mm: drill ø 10 mm (immediately insert the
Dowels 11 supplied).
• For wooden beam ceilings, drill according to the wood screws used.
• For wooden shelf, drill ø 7 mm.
• For the power supply cable feed, drill ø 10 mm.
• For the air outlet (Ducted Version), drill according to the diameter of the external air exhaust duct
connection.
• Insert two screws of the following type, crossing them and leaving 4-5 mm from the ceiling:
• For concrete ceilings, use the appropriate plugs for the screw size (not provided).
• For Cavity ceiling with inner space, with wall thickness of approx. 20 mm, Screws 12h, supplied.
• For wooden beam ceilings, use 4 wood screws (not provided).
• For wooden shelf, use 4 screws 12g with washers 22 and nuts 23, provided.
Содержание IKD 12250.0
Страница 1: ...IKD 12250 0 Instructions Booklet Mode d emploi FR GB...
Страница 2: ......
Страница 6: ...6 GB CHARACTERISTICS Dimensions 650 min 698 120 898 min 861 max 1146 696 350 150 90 306 130 290 20...
Страница 16: ...16 FR CARACTERISTIQUES Encombrement 650 min 698 120 898 min 861 max 1146 696 350 150 90 306 130 290 20...
Страница 23: ......