7
Start-up and recommissioning
7.1
Overview of start-up and recommissioning
The procedure for start-up and recommissioning depends on the type of
fastening and installation position of the manipulator.
Description
Information
Installation position:
floor and mounting
base
Starting up floor-mounted robots (mounting base)
(
>>>
7.2 "Starting up robots (mounting base)" Page 171
)
Installation position:
floor, ceiling, wall and
machine frame
mounting
Starting up floor-mounted robots (machine frame mounting)
(
>>>
7.3 "Starting up robots (machine frame mounting)" Page 178
7.2
Starting up robots (mounting base)
Description
These instructions apply to the variant “mounting base with centering”.
The robot is fastened to an appropriate concrete foundation using bed-
plates and resin-bonded anchors with Dynamic Set.
If the surface of the concrete foundation is not sufficiently smooth and
even, the differences must be evened out with a suitable leveling com-
pound.
When using resin-bonded anchors, use only resin cartridges and anchors
from the same manufacturer. No diamond tools or core drills may be used
for drilling the anchor holes; for preference, drilling tools supplied by the
anchor manufacturer are to be used. It is imperative to follow the manu-
facturer’s instructions for the use of resin-bonded anchors.
Equipment
The following equipment is required:
Designation
Article number
Fork lift truck with sufficient load-bearing
capacity
-
LLA forklift slot KR IONTEC
0000-339-419
Drill with a ø 18 mm bit
-
Setting tool approved by the anchor
manufacturer
-
Set of Allen keys
1.5; 2; 2.5; 3; 4; 5; 6; 8; 10 mm
-
Torque wrench
min. 80 to 400 Nm
For fork slots
-
Torque wrench
min. 40 to 80 Nm
-
Torque wrench
min. 300 to 500 Nm
-
KR IONTEC
MA KR IONTEC V4 | Issued: 11.05.2021
www.kuka.com
| 171/344
Start-up
and
recommissioning
Содержание IONTEC KR 20 R3100
Страница 14: ...KR IONTEC 14 344 www kuka com MA KR IONTEC V4 Issued 11 05 2021 Introduction...
Страница 166: ...KR IONTEC 166 344 www kuka com MA KR IONTEC V4 Issued 11 05 2021 Planning...
Страница 188: ...KR IONTEC 188 344 www kuka com MA KR IONTEC V4 Issued 11 05 2021 Start up and recommissioning...
Страница 300: ...Fig 9 58 Wiring diagram axis A2_KS A1 A3 KR IONTEC 300 344 www kuka com MA KR IONTEC V4 Issued 11 05 2021 Repair...
Страница 301: ...Fig 9 59 Wiring diagram axis A3_KS A1 A3 KR IONTEC MA KR IONTEC V4 Issued 11 05 2021 www kuka com 301 344 Repair...
Страница 302: ...Fig 9 60 Wiring diagram axis A4_KS A1 A3 KR IONTEC 302 344 www kuka com MA KR IONTEC V4 Issued 11 05 2021 Repair...
Страница 303: ...Fig 9 61 Wiring diagram axis A5_KS A1 A3 KR IONTEC MA KR IONTEC V4 Issued 11 05 2021 www kuka com 303 344 Repair...
Страница 304: ...Fig 9 62 Wiring diagram axis A6_KS A1 A3 KR IONTEC 304 344 www kuka com MA KR IONTEC V4 Issued 11 05 2021 Repair...
Страница 310: ...KR IONTEC 310 344 www kuka com MA KR IONTEC V4 Issued 11 05 2021 Repair...
Страница 318: ...KR IONTEC 318 344 www kuka com MA KR IONTEC V4 Issued 11 05 2021 Decommissioning storage and disposal...
Страница 340: ...KR IONTEC 340 344 www kuka com MA KR IONTEC V4 Issued 11 05 2021 KUKA Service...