background image

Index 

E 811 GB

 

 

 

35

 

27/02/2013 

 

7.4  Index 

application........................................................... 11 

attention ................................................................ 7 

cable routing and wiring ...................................... 10 

chemical resistance ...................................... 13, 29 

Chemicals ..................................................... 13, 29 

cleaning .............................................................. 27 

contamination ..................................................... 10 

danger ................................................................... 6 

earth .................................................................... 15 

electromagnetic compatibility ............................... 9 

electromagnetic interference .............................. 10 

front film .............................................................. 13 

impact and vibration ........................................... 10 

inductive actuators .............................................. 10 

installation ............................................................. 8 

installation instructions ......................................... 9 

instruction ............................................................. 7 

Interference Emission ........................................... 9 

limiting value class ................................................ 9 

location of installation ......................................... 10 

note ....................................................................... 7 

notes ..................................................................... 6 

order number ...................................................... 13 

physical design ................................................... 14 

ports .................................................................... 14 

power supply ....................................................... 14 

preventive maintenance........................................ 8 

project planning .................................................... 8 

reliability ................................................................ 6 

safety .................................................................... 7 

Sales & Service .................................................. 34 

servicing ................................................................ 8 

target group .......................................................... 6 

technical properties ............................................. 12 

temperature ........................................................ 10 

under construction ................................................ 7 

working steps

 ........................................................ 7 

 

 

 

 

 

 

 

 

 

 

 

Содержание Ventura Vico 1000

Страница 1: ...Kuhnke Electronics Instruction Manual Ventura Vico 1000 1200 1500 Control and Display Monitor E 811 GB 27 02 2013 xxxxxx...

Страница 2: ...s negligence on our part Reproduction of any part of this docu ment is allowed with the author s consent only We reserve the rights for errors omissions and modifica tions Pictures are similar Microso...

Страница 3: ...Particular Sources of Interference 10 3 System Description 11 3 1 Overview 11 3 2 Application 11 3 3 Technical Properties 12 3 4 Front Film 13 3 5 Model Variants 13 3 6 Physical Design 14 3 7 Power S...

Страница 4: ...endix 28 7 1 Technical Data 28 7 1 1 Basic Data 28 7 1 2 Chemical Resistance 29 7 1 3 Dimensions of Ventura Vico 1000 30 7 1 4 Dimensions of Ventura Vico 1200 31 7 1 5 Dimensions of Ventura Vico 1500...

Страница 5: ...e thus making cumbersome video framing correction unnecessary Touch screen input is transferred via USB Ventura Vico is a range of built in monitors of screen sizes 10 4 12 1 and 15 Robust industrial...

Страница 6: ...is brought to the highest possible standards by exten sive and cost effective means in their design and manufacture These include selecting high quality components quality agreements with our supplie...

Страница 7: ...r you see these symbols in the left margin you will find a list of steps instructing you to take the appropriate computer or hardware actions They are intended as a means of orientation wherever worki...

Страница 8: ...ions are to be complied with in every case Control elements are to be installed in such a way as to exclude unin tended operation Lay control cables such that interference inductive or capacitive is e...

Страница 9: ...ware interface factors and the ensu ing noise voltages are limited to tolerable levels 2 6 2 Interference Emission Interfering emission of electromagnetic fields HF compliant to EN 55011 limiting valu...

Страница 10: ...n assembly rooms or control cabinets 2 6 6 2 Contamination Use suitable casings to avoid possible negative influences due to humidity corrosive gas liquid or conducting dust 2 6 6 3 Impact and Vibrati...

Страница 11: ...nd flexible in dustry PC system for a wide range of practical applications specifically in the fields of mechanical engineering and switching cabinet construction operation and control of tool making...

Страница 12: ...0 cd m 450 cd m 400 cd m Contrast ratio 700 1 700 1 700 1 Aspect angle L R 80 80 80 80 80 80 Aspect angle U L 60 80 65 75 60 80 Response time max 30 ms max 35 ms max 8 ms Error class II II II Life of...

Страница 13: ...nic acids Mineral acids dilution Bases diluted Oils and greases Food products Household cleaners The front film will not resist the following chemicals and influences Benzoyl alcohol Concentrated base...

Страница 14: ...use the connector from the package to attach the unit to the power supply The admissible diameter of the cord connecting the 24 VDC power is be tween 0 2 mm 2 and 2 5 mm 2 Connector 2 pin male 2 5 mm...

Страница 15: ...ometer to maximum brightness Verify that the external potentiometer s resistance is 4 7 k 3 8 1 DVI Graphics Interface X3 The DVI D port transfers the digital screen data and can thus be used for moni...

Страница 16: ...1 2 Ports X5 The USB host adapter USB USB port type A is the port for external pe ripherals such as mass storage devices a mouse or a keyboard It houses a passive hub USB1 touch screen port feeds powe...

Страница 17: ...e areas Heat dissipation To enable sufficient heat dissipation through convection heat exchange at the housing surface the air should be allowed to flow freely around the housing of Ventura Vico This...

Страница 18: ...n In extreme case the touch sensor may lose it electrical operability Control panel opening Mark the area on the control panel where you wish to install the unit then cut a hole into the control panel...

Страница 19: ...2013 Switch off the controller PC Unplug the controller PC from the mains power supply Attach all cables to Ventura Vico and any peripherals Check that all cables are firmly attached at both ends Plu...

Страница 20: ...his sets the operative reso lution and transfer parameters for this session There is no need for video framing correction as it would be normally per formed for a VGA interface In case the controller...

Страница 21: ...tions Do not use the touch screen to run functions relevant to safety Touch the screen with a suitable touch stylus only Periodically calibrate the touch screen Turn the unit off for cleaning and main...

Страница 22: ...ate the touch screen at any later time manually run HCECAL exe On KUHNKE Ventura systems the program is located in Start menu folder Programs Kuhnke 5 3 2 Windows XP WEC7 To calibrate and configure th...

Страница 23: ...tween calibration points and actual corners It allows you to compensate for screen frame and non linearity effects Click on Begin Calibration to start the touch screen calibration proce dure Touch the...

Страница 24: ...on and set the time and area Right Click Area Since it may prove to be difficult to touch a screen at a minutely defined point this panel allows you to define a capture area around that point which wi...

Страница 25: ...s touched The Normal option supports click double click drawing drag and drop and right click functionality Touch Down supports click events only i e you can neither use draw nor drag and drop Touch U...

Страница 26: ...Start up E 811 GB 26 27 02 2013 5 3 2 4 Tools Tab The Tools tab provides touch screen testing and cleaning utilities and dis plays details of Ventura Vico s touch screen controller...

Страница 27: ...All metal components can be given to metal recycling Electronic scrap Electronic components such as circuit boards drives etc are kept and dis posed of separately For details on proper disposal pleas...

Страница 28: ...61000 4 4 burst 500 V compliant to IEC 61000 4 5 surge symmetrical 500 V compliant to IEC 61000 4 5 surge asymmetrical signal lines 1 kV compliant to IEC 61000 4 4 burst length 3 m static electricity...

Страница 29: ...ithstands the following chemicals Ketones Esters Alcohols Aromatic hydrocarbons Chlorinated hydrocarbons Organic acids Mineral acids dilution Bases diluted Oils and greases Food products Household cle...

Страница 30: ...30 27 02 2013 7 1 3 Dimensions of Ventura Vico 1000 To find a complete installation drawing pdf file browse the Internet for www kuhnke com DOWNLOAD or find the product descriptions available on the...

Страница 31: ...31 27 02 2013 7 1 4 Dimensions of Ventura Vico 1200 To find a complete installation drawing pdf file browse the Internet for www kuhnke com DOWNLOAD or find the product descriptions available on the...

Страница 32: ...32 27 02 2013 7 1 5 Dimensions of Ventura Vico 1500 To find a complete installation drawing pdf file browse the Internet for www kuhnke com DOWNLOAD or find the product descriptions available on the...

Страница 33: ...control and display monitor including touch screen functionality Interfaces DVI USB RS232 touch 24 VDC power pack Resolution 1024x768 XGA 7 2 2 Accessories Set of cables Ventura Vico 5m 639 800 03 DVI...

Страница 34: ...comprehensive overview of our sales and service network including all the relevant addresses www kuhnke com 7 3 1 Malente Headquarters Kuhnke Automation GmbH Co KG L tjenburger Stra e 101 D 23714 Male...

Страница 35: ...t film 13 impact and vibration 10 inductive actuators 10 installation 8 installation instructions 9 instruction 7 Interference Emission 9 limiting value class 9 location of installation 10 note 7 note...

Отзывы: