Maintenance and storage
Shredders
BKE 280-305 SUPER
55
• Fit the knives according to the direction of travel of
the machine.
• Check that there is still 1 to 2 mm (0.04’’ - 0.08’’)
play between the pair of knives and the supports.
- Checking the balance:
• Couple PTO shaft on machine side.
• Slightly lift the machine from the ground.
• Start the PTO drive and increase speed
progressively up to a steady speed of 540 min
-1
.
• When mounted correctly, the rotor must rotate
without causing the machine to vibrate.
Belt tension
Checking the tension:
Through the belt guard slot:
- Apply a force of 35 N (1.6 lbf) on the belt: the belt
should not deflect more than H = 7 mm (0.3’’).
Check belt tension:
After the first 3 hours of use.
Every 8 hours.
Содержание BKE 280 SUPER
Страница 1: ...JN033AGB A OPERATOR S MANUAL Shredders BKE 280 305 SUPER JN033AGB A English 05 2010...
Страница 2: ......
Страница 26: ...Shredders 24 BKE 280 305 SUPER Safety Risk of entanglement 13 Stay clear of rotating drive line...
Страница 66: ...Shredders 64 BKE 280 305 SUPER Appendix T Axle loads Tractor only...
Страница 68: ...Shredders 66 BKE 280 305 SUPER Limited warranty Limited warranty...
Страница 69: ...Limited warranty Shredders BKE 280 305 SUPER 67...
Страница 70: ......
Страница 71: ......
Страница 72: ......