EXCAVATOR OPERATION
24
OPERATION OF THE DOZER
1. To raise the dozer, pull back the control lever. Pushing
the control lever forwards, lowers the dozer.
2. While undertaking earth moving work, control both
drive levers with the left hand and the dozer control
lever with the right hand.
TWO PATTERN SELECTION
SYSTEM(TPSS)
To avoid personal injury:
A
Study control lever pattern A and pattern B.
Then choose the one which is most familiar
A
Position the pattern selector lever (located on
the right side of operator's seat) in either the
lower position (pattern A) or the upper position
(pattern B).
A
Engage the lock lever to prevent accidental
pattern change.
A
Familiarize yourself with the pattern selected
by operating slowly.
B
Pattern Change
1. Loosen the lock lever knob and slide it to the direction
(a), and position the pattern selector lever to the
desired position.
2. Slide the lock lever knob to the direction (b) and tighten
it.
(1) Dozer control lever
(A) "Raise"
(B) "Lower"
(A) "Raise"
(B) "Lower"
(1) Pattern selector lever (Two Pattern Selection System: TPSS)
(2) Lock lever knob
Содержание Super Series 2 KX 91-3
Страница 14: ...SAFE OPERATION 6 6 DANGER WARNING AND CAUTION LABELS...
Страница 15: ...7 SAFE OPERATION...
Страница 16: ...SAFE OPERATION 8...
Страница 17: ...9 SAFE OPERATION...
Страница 18: ...SAFE OPERATION 10...
Страница 19: ...11 SAFE OPERATION...
Страница 20: ...SAFE OPERATION 12...
Страница 95: ...75 LIFTING CAPACITY...
Страница 96: ...76 LIFTING CAPACITY...
Страница 97: ...77 LIFTING CAPACITY...
Страница 98: ...78 LIFTING CAPACITY...