Maintenance
104
Maintenance
intervals
Af
ter 10 w
o
rkin
g h
ours
Every da
y
Every 40 h
o
u
rs
of u
s
e
Every 80 h
o
u
rs
of u
s
e
Every 100 h
o
u
rs
of u
s
e
Every 200 h
o
u
rs
of u
s
e
or o
n
ce (
1
x) a
year
Every m
ont
h
Every seaso
n
As req
u
ired
Oil chan
ge
Lu
bricat
ion
Ch
eck
Rep
lacem
ent
Page
General c
h
eck an
d servic
e
Hydraulic hoses every 6 years
•
Cutting disc after 1 hour of use
•
Cutting disc
•
•
•
•
Universal joint
•
•
Cutting disc after 1 hour of use
•
Blades
•
•
•
•
P.T.O. shaft
•
Friction clutch
•
•
Friction disc
•
•
Stone guard and counter blade
•
•
•
•
Cones
•
•
•
•
Tarpaulin
•
•
•
•
Lu
bricat
ion
Drawbar
•
•
Cutting unit:
-
Bearings on rollers
•
•
Universal joint
•
•
•
•
Hydraulic cylinder - connecting link
•
•
Spindle with spring
•
•
P.T.O. shaft
•
•
Содержание DMC 8028
Страница 22: ...Blank page 22 Blank page ...
Страница 27: ...About the machine 27 Technical data Machine dimensions 80xx model D G H F I J K B E C A ...
Страница 29: ...About the machine 29 85xx model B D E G H F A C I J K ...
Страница 132: ...Maintenance 132 Activate the tractor hydraulics and lower the cutting unit of the machine ...
Страница 136: ...Maintenance 136 Activate the tractor hydraulics and lower the cutting unit of the machine ...
Страница 152: ...Maintenance 152 Attach the protection Bolt ...
Страница 182: ...Maintenance 182 Activate the tractor hydraulics and lower the cutting unit of the machine ...
Страница 196: ...Maintenance 196 Close the mechanical safety valve Remove the protection around the transmission Valve Bolt ...
Страница 201: ...Maintenance 201 Affix and tighten the P T O shaft fully on the drawbar Close the guard Guard ...
Страница 215: ...Notes 215 Notes ...