6 Commissioning/Start-up/Shutdown
28 of 64
Hya-Rain/Hya-Rain N
6 Commissioning/Start-up/Shutdown
6.1 Commissioning/Start-up
6.1.1 Prerequisites for commissioning/start-up
Before commissioning/start-up of the system make sure that the following
requirements are met:
▪
The system has been properly connected to the electric power supply and is
equipped with all protection devices.
▪
All relevant VDE standards and/or regulations applicable in the country of use are
complied with.
6.1.2 Priming and venting the system
Filling
ü
Connect the mains water back-up system to the mains water supply.
(
ü
The system has been properly connected to the power supply.
(
1. Set the operating mode selector switch to mains water mode for approximately
ð
The mains water storage tank will fill automatically.
Venting
ü
The mains water storage tank has been filled.
ü
The power plug has been plugged into the socket.
1. Insert the vent hose into the mains water storage tank.
Fig. 19:
Inserting the vent hose into the mains water storage tank
2. Open a consumer installation.
3. Set the master switch to 1. (
ð
The system will be vented automatically.
4. Close the vent valve.