5 Installation at Site
18 of 64
Hya-Rain/Hya-Rain N
5 Installation at Site
5.1 Safety regulations
DANGER
Unsuitable electrical installation
Danger to life!
▷
Make sure the electrical installation meets the VDE 0100 installation rules (i.e.
sockets with earthing terminals).
▷
Make sure the electric mains is equipped with a residual current device of
maximum 30 mA.
▷
Always have the electrical connections installed by a trained and qualified
electrician.
5.2 Checks to be carried out prior to installation
Before beginning with the installation check the following:
▪
The system can be operated on the power supply network according to the data
on the name plate. (
▪
The fluid to be handled matches the description of suitable fluids.
(
▪
The installation room is dry, frost-free and well-ventilated.
▪
The ambient conditions have been met. (
▪
The wall (e.g. outside wall) is suitable for accommodating 4 plug fixings of
10 mm diameter and for carrying the weight of the system.
(
5.3 Setting up and installing the system
ü
A suitable installation site has been selected that meets the requirements.
ü
Sufficient clearance in all directions is provided for servicing work.
1. Fasten the bolt hole pattern provided to the corresponding wall.
2. Drill four holes of 10 mm diameter in accordance with the bolt hole pattern.
3. Insert the plug fixings.
4. Mount and align the lower hanging brackets.
5. Undo the nuts. Remove the cover.
6. Place the system on the lower hanging brackets.
7. Fit the upper hanging brackets.
8. Fit the system cover. Fasten it with nuts.