5 Installation at Site
17 of 36
AmaRoc
5.4 Installing the submersible mixer stand
NOTE
For free-standing models, the square guide rail needs to be fitted on the
submersible mixer stand first.
5.4.1 Preparing the foundation
1.
Mark the installation position inside the tank as shown in the site layout
drawing. Mark the outline of the submersible mixer stand and the fixing points.
Use a template, if required.
Models installed with an upper holder: Make sure the square guide rail is
correctly aligned in relation to the concrete wall or bridge.
2.
Mark the flow direction.
3.
To ensure optimum contact between the submersible mixer stand and the
concrete floor, apply the chemical mortar as shown below, using a commercial
applicator gun.
Work quickly, bearing in mind the curing time of the chemical mortar! Observe
the manufacturer's application instructions!