Commissioning
29
Pos: 57.9 /BA/Erstinbetriebnahme/EasyCut/Kontrollliste Erstinbetriebnahme EC B 1000 @ 212\mod_1389679621695_78.docx @ 1739025 @ 3 @ 1
6.2.1
Check List for Initial Operation
•
Install the machine according to assembly instructions of the machine.
•
Check all screws and nuts for firm attachment, observe prescribed torque.
•
Check all sensors to make certain they are correctly seated. Check the setting values and
set them, if necessary. Observe prescribed tightening torque.
•
Check safety devices.
• Lubricate
the
machine.
•
Check the oil on all gearboxes.
•
Adapt the hydraulic system to the tractor.
•
Check the density of the hydraulic system.
•
Check whether the tractor meets the requirements of the machine.
•
Check axle loads, minimum ballast and total weight.
•
Adapt the coupling points to the tractor, is necessary.
•
Check universal shaft length and adapt the length, if necessary.
•
In transport position, the cross conveyor must be checked for firm attachment.
•
Check the conveyor belt setting and the running behaviour, depending on the equipment of
the machine; refer to chapter Special Equipment “Conveyor Belt Setting”.
•
Vent the friction clutches.
•
Perform all machine functions (e. g. lifting and lowering) one after the other until the
hydraulic system is vented.
Pos: 57.10 /Layout Module /---------------Seitenumbruch---------------- @ 0\mod_1196175311226_0.docx @ 4165 @ @ 1
Содержание EasyCut B 1000 CR
Страница 243: ......
Страница 244: ...01 2 3 4 5 6 7 6 8 1 95 76 1 6 7 9 0 1 2 3 4 5 20 0 6 2 5 78 1 2 3 4 5 20 0 6 2 5 2 9 6 6 A ...