Placing in Storage
340
Pos: 61.15 /BA/Einlagerung/Rundballenpressen/Überlastkupplung an Gelenkwelle Comprima @ 96\mod_1328790282568_78.docx @ 822224 @ 33 @ 1
15.2.2
Venting the overload coupling on the PTO shaft
Friction clutch only
3
2
1
4
COM00337
Fig. 267
Following extended downtimes, overload coupling surfaces (2) may stick to the contact
surfaces.
Vent the overload coupling before use.
•
Loosen the eight screws (1) to release the spring pressure from the outside washers (3, 4).
•
Turn the PTO shaft manually.
•
Tighten the screws until the covering ring (2) is lying directly against the outside washers (3,
4).
Note
Do not tighten the screws (1) too tight. The coupling must still be able to slip.
•
Then turn the screws (1) one sixth of a revolution back.
Pos: 62 /Layout Module /---------------Seitenumbruch---------------- @ 0\mod_1196175311226_0.docx @ 4165 @ @ 1
Содержание Comprima CF 155 XC
Страница 383: ......