LOADING AND SECURING
152
Operating instructions • Semitrailer • 505369471-04 • 02/2019
1
5
3
2
4
Fig. 8-45:
Multi Steel system with steel mat
loading
1
Plug-in posts with foot lever
2
Lateral plug-in post in extendible post
socket
3
Steel mats
4
Tensioning device with lashing ring
5
Support struts
Reinforced lashing holes and Multi Lash
lashing rings for lashing the load are avail-
able in the side rails of the trailer.
For loads with excess width, 3000 daN
lashing hooks below the external frame
and 5000 daN 180° lashing rings integ-
rated in the tensioning device can be used.
Securing the steel mat packages with
the Multi Steel system
1
2
3
Fig. 8-46:
Positioning the plug-in posts
1
Front plug-in position (steel mats 6 m
in length)
2
Rear plug-in position (steel mats 5 m in
length)
3
Steel mats
► Depending on the loading situation, in-
sert the plug-in posts with foot lever in
the post sockets in the front area of the
trailer in the front position (steel mats
6 m in length) or in the rear position
(steel mats 5 m in length).
► Insert the support strut into the post
socket.
6
5
1
2
4
3
Fig. 8-47:
Plug-in post with support strut
1
Integrated lashing belt guide
2
Bolt (secured with spring cotter pin)
3
Support strut