10 Operation
10.2 Commissioning
1
2.
Compare the direction of rotation of the fan impeller with the arrow indicating the direction of
rotation
1
.
3.
If the directions do not match, swap the two electrical connection phases. Repeat Steps 1 and 2.
10.2.4
Commissioning the pump
Personnel qualification:
o
Fitter
o
Electrician
Personal protective equipment:
o
Work clothing
o
Face protection
o
Protective gloves
o
Safety boots
Aids:
o
Collection tank
DANGER
Risk of death resulting from bursting components and emitted pumped liquid.
As a result of impermissibly high pressure, components can burst with high energy, for example
through the pressure-side pipe system being shut off.
► Wear personal protective equipment during all the work.
► Before carrying out commissioning ensure that a safety valve is installed in the pressure-side pipe
system at the system end.
WARNING
Risk of injury through emitted pumped liquid.
Pumped liquids can be hot, poisonous, combustible and caustic.
► Wear personal protective clothing during all the work. Ensure face protection.
► Collect any discharging pumped liquid safely and dispose of it in an environmentally compatible
manner in accordance with the applicable local regulations.
WARNING
Hot surface.
Touching of uninsulated hot surfaces results in burns.
► Insulate components and pipings in which hot liquids (> 60 °C) flow before commissioning.
WARNING
Danger of injury through rotating parts.
► Ensure that the coupling protection is mounted.
ATTENTION
Dry running can damage pump equipment.
► Ensure that the pump and the connected pipe system are filled properly.
► If the pump does not deliver after 10 – 15 seconds, abort commissioning.
Operating instructions
OIC 18en-GB Edition 2020-01