INSTALLATION PLANNING
Hussong Mfg. Co., Inc. • Kozy Heat Fireplaces
#ABY R.2 October 2020
3.4 Nailing Flange Assembly
and Installation
CAUTION: Never permanently remove these assemblies from the
fireplace—they must be secured regardless of finish material used.
1. Remove (2) nailing flanges from the right and left side of the
fireplace.
2. Align nailing flanges with holes on the outside corners of
fireplace, with the stand-off flanges on the nailing flanges facing
away from the fireplace.
3. Secure the nailing flanges to the fireplace with screws (provided)
through the slots in nailing flanges.
4. Bend perforation on nailing flange until parallel with fireplace
face. Do not bend toward fireplace face.
5. UNTIL ALL FRAMING REQUIREMENTS ARE COMPLETED: Position
framing stud against the small stand-off (located on backside of
nailing flange). Secure with nails or screws.
•
When installed, the nailing flanges provide the minimum 7”
(177mm) clearance from the sides of the fireplace to framing.
Figure 3.3, Nailing Flange Installation