KOZI
D
IRECT
V
ENT
G
AS
I
NSERT
WARNING: DO NOT OPERATE APPLIANCE WITH THE GLASS FRONT REMOVED,
CRACKED OR BROKEN. REPLACEMENT OF THE GLASS SHOULD BE DONE BY A
LICENSED OR QUALIFIED SERVICE PERSON.
Fuel Conversion Instructions
IMPORTANT:
It is recommended that a qualified service agent, technician or your local
KOZI
dealer conduct all conversion attempts.
WARNING:
Read the following instructions fully and to completion prior to starting the conversion.
Leakage testing must be performed at every gas connection that has been altered.
Before you begin this alteration, check the conversion kit to ensure all of the components
are present. The list below summarises the 5 components included in the kit.
Gas Valve Regulator – LP (red label), NG (white label)
•
•
•
•
•
Pilot Orifice
Burner Orifice
Instruction Sheet
Conversion Decal
If all parts are present and accounted for, continue with the following instructions.
1. Turn the main burner switch OFF, turn the gas control knob to the OFF position, and
allow time for the unit to cool. Turn OFF or disconnect the gas supply to the unit.
Unplug the electrical power cord from the wall outlet.
2. Open the control compartment door to gain access to the gas valve assembly. With
a proper screwdriver, remove and discard the old gas valve regulator and gasket
from the valve assembly by removing the 2 mounting screws. Install the new RB
regulator and gasket with the new screws supplied. Tighten screws securely. Place
the small conversion sticker supplied with the new regulator on the plate directly
underneath the gas valve, in plain view of the operator.
3. Remove the side door panels. Remove the glass door from the unit, using extra
caution not to scratch the gold finish. Gently place the door on a soft, non-abrasive
surface, be careful not to drop the door.
4. Carefully remove the ceramic fibre logset from the burner assembly, and place them
out of the way.
16