34
Experts in heating
User Manual
Twin Bio
- PLV 09.13
8
. Boiler operation and
m
aintenance
8. Boiler operation and maintenance
Use the main switch to deactivate the boiler and wait until
the boiler cools down – min. 1 hour before maintenance
(boiler cleaning).
8.A. Boiler operation guidelines
Normal daily boiler operation:
• check correct operation of system components: burner,
control system;
• check water level on a pressure gauge;
• check fuel level and quality and fuel feed system operation;
• check hydraulic joints leak tightness;
• keep the boiler room clean and tidy.
In case of any performance issues, remove the faulty devices
or contact an Authorised Service Centre to arrange a repair or
an adjustment.
8.B. Inspection scope and schedule:
a) Monthly
• check system water pressure
• check safety valve operation
• check control and safety device operation
• check tightness of all connectors and joints
• check balanced ventilation system
b) Minor inspection (every 6 months)
• check rope seal and gaskets,
• check boiler door thermal insulation,
• check safety devices (safety valve, safety temperature
limiter STB etc.),
• fl ue gas analysis (if a sudden increase in fl ue gas
temperature is identifi ed, the combustion part of the boiler
must be cleaned)
c) Major inspection (every 12 months)
• check rope seal and gaskets
• check boiler door and cleanout cover thermal insulation
• check safety devices (safety valve, safety temperature
limiter STB etc.)
• analyse fl ue gas
• clean combustion section of the boiler
• check thermal insulation of the boiler
• check and adjust burner, adjust control system settings
After a long boiler/burner downtime, the residual oxygen
in boiler water and the oxygen from the air mixed with carbonic
acid have highly corrosive properties. Take any precautions
necessary after if the boiler downtime lasted over a week.
Periodically remove the soot, sludge and ash from
the combustion chamber, the fl ue tubes and the grate. Clean
the boiler as necessary, but at least every 2 weeks. Remove
ash as required.
8.C. Maintenance
a) Boiler, burner, fuel feed system – mechanical
The regular and correct maintenance of the boiler is
a precondition of a correct and reliable operation and low fuel
consumption of the system. Contact an Authorised Service
Centre at least once a year and after every boiler downtime
to arrange an inspection.
Heating system maintenance procedure:
• deactivate the boiler (system) (stop mode);
• wait for a complete stop and allow to cool;
• reduce the boiler temperature to the level allowing safe
maintenance;
• open boiler door;
• clean combustion chamber and all fl ues and check the rope
seals in the boiler doors (replace if necessary);
• check and clean the burner (remove if necessary) – also,
clean the motor and fan (especially vanes) from the outside;
• close the boiler door with burner;
• remove the cover;
• clean the combustion products from the rear section
of the boiler;
• check cover gasket quality (rope seals) and remove
as required;
• close the rear boiler cleanout;
• check smoke duct condition and gas tightness;
• check installation and operation of the boiler sensors;
• check installation and operation of the fuel feed system;
• feeder gear motor;
• fuel feed ducts leak tightness and fl ow capacity.
Содержание 4062852055092
Страница 1: ...E N G L I S H E N...
Страница 2: ......
Страница 4: ......
Страница 41: ......
Страница 42: ......
Страница 43: ...D E U T S C H D E...
Страница 44: ......
Страница 46: ......
Страница 83: ......
Страница 84: ......
Страница 85: ...R U...
Страница 86: ......
Страница 88: ......
Страница 89: ...89 Twin Bio PLV 09 13 VI Twin Bio 1 2 3 4 Twin Bio 5 6 7 8 9 10 11 12 13...
Страница 96: ...96 Twin Bio PLV 09 13 4 Twin Bio 4 E A 1595 mm B 88 mm 02 1 2 3 4 1 2 3 4 02 4 H...
Страница 97: ...97 Twin Bio PLV 09 13 4 Twin Bio 4 F KOSTRZEWA 286 Platinum Bio DX01 02 Twin Bio...
Страница 100: ...100 Twin Bio PLV 09 13 5 5 5 A a A1 mm 500 B1 mm 700 C1 mm 500 H1 mm 2000 g mm 50...
Страница 101: ...6 Uruchamianie 101 Twin Bio PLV 09 13 5 B 0 05 50 20x20 2 25 14x14 2 5 C 45 C 40 50 15 C...
Страница 102: ...102 Twin Bio PLV 09 13 5 M M M c w u Platinum Bio GSM Twin Bio...
Страница 103: ...103 Twin Bio PLV 09 13 5 c w u Platinum Bio M M M GSM Twin Bio...
Страница 104: ...104 Twin Bio PLV 09 13 5 M M M Platinum Bio GSM Twin Bio c w u...
Страница 105: ...105 Twin Bio PLV 09 13 5 5 D pH 8 5 20 f 0 05 60 KOSTRZEWA 5 E Twin Bio 100 C Twin Bio Twin Bio...
Страница 107: ...107 Twin Bio PLV 09 13 5 6 5 G 5 H 6 6 A 6 B 5 D 30 C 6 C...
Страница 108: ...108 Twin Bio PLV 09 13 6 6 D KOSTRZEWA www kostrzewa com pl ON 6 E...
Страница 109: ...109 Twin Bio PLV 09 13 6 7 7 7 A...
Страница 110: ...110 Twin Bio PLV 09 13 7 7 B 1 2 3 4 5...
Страница 111: ...111 Twin Bio PLV 09 13 7 7 C 1 2 3 4 5...
Страница 112: ...112 Twin Bio PLV 09 13 7 7 D 1 2 3 4 5...
Страница 113: ...113 Twin Bio PLV 09 13 7 7 E 1 2 3...
Страница 114: ...114 Twin Bio PLV 09 13 7 7 F 1 7 G 1 2 3...
Страница 116: ...116 Twin Bio PLV 09 13 7 7 J 2 1 2 1 1 2 3 4 5 6 7 K 200 C 1 OFF 2 3 4 5 6 7 8 ON 9 70 C 10...
Страница 117: ...117 Twin Bio PLV 09 13 7 13 16 kW 17 24 kW Twin Bio Twin Bio TB 16 TB 24 N 310 310 O 440 440 P 338 438...
Страница 118: ...118 Twin Bio PLV 09 13 8 8 1 8 A 8 B a 6 STB 12 STB 1 Platinum Bio v02 2 8 C a...
Страница 119: ...119 Twin Bio PLV 09 13 8 1 a 2...
Страница 120: ...120 Twin Bio PLV 09 13 8 3 4...
Страница 121: ...121 Twin Bio PLV 09 13 8 9 24 08 1991 81 11 06 2006 80 06 Platinum Bio 9 60 C...
Страница 122: ...122 Twin Bio PLV 09 13 10 11 12 10 11 1 2 3 4 5 6 7 8 9 10 11 12 13 14 12 45 C...
Страница 123: ...123 Twin Bio PLV 09 13 13 13 a STB STB...
Страница 124: ...124 Twin Bio PLV 09 13 13...
Страница 125: ......
Страница 126: ......