![KOS Box Atollo freestanding Скачать руководство пользователя страница 45](http://html1.mh-extra.com/html/kos/box-atollo-freestanding/box-atollo-freestanding_assembling-instruction_1999117045.webp)
45
IT
COLLEGAMENTI IDRAULICI
(vers. BASE)
La tabella sottostante riassume tutti i collegamenti da eseguire
(alcuni di essi sono già effettuati dal Costruttore ma si raccomanda
comunque di verificarli)
utilizzando esclusivamente tubi forniti
dal Costruttore.
Collegamento
“D”
Rubinetteria
Getti dorsali
1
Rubinetteria
Doccione
2
Rubinetteria
Test piedi
3
Rubinetteria
Asta doccia
4
Rubinetteria
Getti lombari
5
Attacchi acqua calda e fredda
6
Attacchi acqua calda e fredda
Filtri
7
UK
PLUMBING CONNECTIONS
(version BASE)
The table below summarizes all connections to be made (some of
them have already been made by the manufacturer but should
nonetheless be checked).
Use only tubes provided by the
manufacturer.
Connection
“D”
Tap fixture
Dorsal jets
1
Tap fixture
Shower head
2
Tap fixture
Foot test
3
Tap fixture
Shower rod
4
Tap fixture
Lumbar jets
5
Hot and cold water connections
6
Hot and cold water connections
Filters
7
FR
BRANCHEMENTS HYDRAULIQUES
(vers. BASE)
Le tableau ci-dessous résume tous les branchements à effectuer
(certains ont déjà été effectués par le fabricant, mais nous vous
recommandons de les contrôler)
en utilisant exclusivement les
tuyaux fournis par le fabricant.
Branchement
“D”
Robinetterie
Jets dorsaux
1
Robinetterie
Pomme de douche
2
Robinetterie
Test pieds
3
Robinetterie
Barre de douche
4
Robinetterie
Jets lombaires
5
Raccords eau chaude et froide
6
Raccords d’eau chaude et froide
Filtres
7
DE
WASSERANSCHLÜSSE
(Ausf. GRUNDMODELL)
In der nachfolgenden Tabelle werden alle auszuführenden
Anschlüsse zusammengefasst (einige wurden bereits im Werk
durchgeführt, sollten aber trotzdem überprüft werden)
aus-
schliesslich vom Hersteller gelieferte Rohre verwenden.
Anschluss
“D”
Armatur
Rückenmassagedüsen
1
Armatur
Kopfdusche
2
Armatur
Fußtest
3
Armatur
Duschstange
4
Armatur
Lendenmassagedüsen
5
Anschlüsse für Warm- und Kaltwasser
6
Anschlüsse für Warm- und Kaltwasser
Filter
7
PT
LIGAÇÕES HIDRÁULICAS
(vers. BASE)
A tabela abaixo resume todas as ligações a executar (algumas
delas já são efectuadas pelo Fabricante mas recomenda-se de
controlá-las)
utilizando exclusivamente tubos fornecidos
pelo Fabricante.
Ligação
“D”
Torneiras
Jactos dorsais
1
Torneiras
Duche
2
Torneiras
Teste pés
3
Torneiras
Haste duche
4
Torneiras
Jactos lombares
5
Engates de água quente e fria
6
Engates de água quente e fria
Filtros
7
ES
CONEXIONES HIDRÁULICAS
(vers. BASE)
El cuadro que se muestra más abajo resume todas las conexiones
a realizar (algunas de ellas ya vienen realizadas de fábrica pero,
en cualquier caso, se recomienda comprobarlas)
utilizando ex-
clusivamente los tubos suministrados por el fabricante.
Conexión
“D”
Grifería
Chorros dorsales
1
Grifería
Ducha
2
Grifería
Probador de pies
3
Grifería
Barra de la ducha
4
Grifería
Chorros lumbares
5
Conexiones de agua caliente y fría
6
Conexiones de agua caliente y fría
Filtros
7
Содержание Box Atollo freestanding
Страница 18: ...18 1 Fase Phase Montageschritt BASE EASY TOP 2 3 1 A EASY TOP BASE A2 A1 A1 5 4 A2 A1...
Страница 20: ...20 2 1 A 4 3 B 2 4x M6x60 2x M6x40 OK 3 BASE EASY TOP Fase Phase Montageschritt...
Страница 22: ...22 3 BASE EASY TOP Fase Phase Montageschritt A B OK NO C B C 2 2 B 3 2x M6x40 C 4 OK 1...
Страница 24: ...24 4a BASE EASY TOP Fase Phase Montageschritt D1 D4 D5 D2 D3 2 1 D3 D1 D1 D4 3 D6 OK 4x TCEI M4X25...
Страница 26: ...26 4b D C C 1 D 3x M5x20 2 3x M5x20 3 Fase Phase Montageschritt BASE EASY TOP...
Страница 28: ...28 4c 4 4 2 2 2 4 3 S N Q D5 D2 D1 1 S P Q P P Q Fase Phase Montageschritt BASE EASY TOP...
Страница 30: ...30 4d 2 1 D3 D8 D7 D7 4 D3 D7 OK 3 3 4 Fase Phase Montageschritt BASE EASY TOP...
Страница 32: ...32 4e D6 D4 D4 D7 D7 4x TCEI M4x25 1 2 R Fase Phase Montageschritt BASE EASY TOP...
Страница 34: ...34 5 BASE EASY TOP Fase Phase Montageschritt A E E6 2 E E1 E4 E2 1 E3 E1 E D4 D4 A...
Страница 36: ...36 6 BASE EASY TOP Fase Phase Montageschritt 1 E4 E1 E1 E3 E2 E1 E3 2 3 E5 E7 E6 E5...
Страница 38: ...38 7 BASE EASY TOP Fase Phase Montageschritt 1 2 2x M6x40 3 2x M6x60 C 4...
Страница 40: ...40 8 BASE EASY TOP Fase Phase Montageschritt 1 2 M B M 1 4 M12 3 4...
Страница 42: ...42 9a 5 4 3 1 2 4 5 3 1 5 2 6 6 7 Fase Phase Montageschritt BASE S...
Страница 44: ...44 9a 2 3 4 2 5 1 2 4 5 3 1 6 7 6 Fase Phase Montageschritt BASE D...
Страница 46: ...46 9b 5 4 3 5 2 2 4 5 3 1 7 1 7 2 7 3 7 4 7 5 6 6 8 Fase Phase Montageschritt EASY S TOP S...
Страница 48: ...48 9b 2 3 4 2 5 6 2 4 5 3 1 7 1 7 2 7 3 7 4 7 5 6 7 Fase Phase Montageschritt EASY D TOP D...
Страница 50: ...50 1 11 9c Fase Phase Montageschritt 8 8 9 9 10 Fase Phase Montageschritt EASY TOP...
Страница 62: ...62 13 Fase Phase Montageschritt BASE EASY TOP 17 17...
Страница 64: ...64 14 BASE EASY TOP Fase Phase Montageschritt 743 1042 150 150 483 1 3 2 N mm...
Страница 66: ...66 15 Fase Phase Montageschritt 3 1 2 4 5 BASE EASY TOP...
Страница 68: ...68 16 BASE EASY TOP Fase Phase Montageschritt 1 4x M6x20...
Страница 70: ...70 17 BASE EASY TOP Fase Phase Montageschritt G H B C H L...
Страница 72: ...72...
Страница 73: ...73...
Страница 74: ......