Power Considerations
AM4011
Page 5 - 6
ID 1022-1626, Rev. 1.0
P R E L I M I N A R Y
5.5
Payload Start-Up Current of the AM4011
The following table indicates the payload start-up current of the AM4011 during the first 2-3 sec-
onds after the payload power has been applied. The payload power consumption of the
AM4011 during operation is indicated in Table 5-2.
For further information on the start-up current of the AM4011 contact Kontron’s Technical Sup-
port.
Table 5-4:
Payload Start-Up Current of the AM4011
MEMORY
CONFIGURATION
INTEL® Core™2 Duo
1.5 GHz
2 GB / 4 GB
1.7 A
Содержание AM4011
Страница 10: ...Preface AM4011 This page has been intentionally left blank Page x ID 1022 1626 Rev 1 0 P R E L I M I N A R Y...
Страница 16: ...Preface AM4011 This page has been intentionally left blank Page xvi ID 1022 1626 Rev 1 0 P R E L I M I N A R Y...
Страница 17: ...AM4011 Introduction ID 1022 1626 Rev 1 0 Page 1 1 Introduction Chapter 1 1 P R E L I M I N A R Y...
Страница 59: ...AM4011 Installation ID 1022 1626 Rev 1 0 Page 3 1 Installation Chapter 1 3 P R E L I M I N A R Y...
Страница 69: ...AM4011 Configuration ID 1022 1626 Rev 1 0 Page 4 1 Configuration Chapter 1 4 P R E L I M I N A R Y...