Chapter
1
Chapter 1
Before Installation
This chapter describes the matters you need to be aware of
before installing the unit.
Preparations for Installation ...............................1-2
Checking Installation Requirements............. 1-2
Checking Maintenance Space...................... 1-3
Checking Power Requirements.................... 1-3
Checking Route for Power Cable
and Network Cable....................................... 1-3
Checking Unpacking Area............................ 1-4
Checking Transfer Path................................ 1-4
Checking Network ........................................ 1-4
Equipment and Tools Necessary
for Installation............................................... 1-5
Name of Parts ....................................................1-6
Installation Workflow ..........................................1-8
0404YF220A.book 1 ページ 2009年8月20日 木曜日 午後1時26分
Содержание 0404
Страница 38: ...0404YF220A book 26 ページ 2009年8月20日 木曜日 午後1時26分 ...
Страница 47: ...0404YF220A book 1 ページ 2009年8月20日 木曜日 午後1時26分 ...
Страница 48: ...0404YF220A 0404YF220A 20090827MD 20090827MD ...