2.4 Changing Operation Panel Installation Position
2-17
2.4
Changing Operation Panel Installation Position
For vertical installation, change the installation position of the operation panel.
Requirements
The procedures described in this manual require the following tools:
Operation Panel Installation Position
1
Remove the second front back panel.
•
Six screws (M4
×
8)
•
Four spacers
2
Remove the circuit board cover.
•
A: 3 screws (M3
×
6)
Loosen all screws.
•
B: 3 screws (M3
×
20)
Remove all screws.
3
Remove the connectors from the MDU, and
remove the cable from the wire saddle.
•
CN1 (MCN1: Cable)
•
CN2 (MCN2: Cable)
No.
Tools
1
Phillips head screwdriver
Horizontal installation configuration
(Factory configuration)
Operation
unit
Vertical installation configuration
Horizontal installation configuration
(Factory configuration)
Operation
unit
Vertical installation configuration
Second Front Back Side
First Front Back Side
3
2
4
B
1
A
CN1
CN2
Back of the first front side
MDU
0404YF220A.book 17 ページ 2009年8月20日 木曜日 午後1時26分
Содержание 0404
Страница 38: ...0404YF220A book 26 ページ 2009年8月20日 木曜日 午後1時26分 ...
Страница 47: ...0404YF220A book 1 ページ 2009年8月20日 木曜日 午後1時26分 ...
Страница 48: ...0404YF220A 0404YF220A 20090827MD 20090827MD ...