2.4 Changing Operation Panel Installation Position
2-20
12
Install the insertion unit to the main unit.
•
Five hexagonal Phillips socket screws (M4
×
8)
Tighten the screws in the following order:
1. Tighten three screws loosely on the first front side.
2. Tighten a screw firmly on the second front side.
3. Tighten the three screws firmly that have been
loosened on the first front side.
4. Tighten a screw on the back of the second front side
firmly.
13
Connect the cables on the insertion unit to the
MDU, and then put the cables through the wire
saddle.
•
MCN1
→
CN1 (MDU circuit board)
•
MCN2
→
CN2 (MDU circuit board)
14
Install the circuit board cover.
•
A: 3 screws (M3
×
6)
•
B: 3 screws (M3
×
20)
15
Install the first front panel.
•
Six screws (M4
×
8)
Hold the bottom of the first front panel with both hands
and push the top of the panel into the top panel.
16
Close the second front cover.
First front side
Caution
Check the route of the cable to ensure it will
not become trapped.
CN1
CN2
Back of the first front side
MDU
First Front Back Side
2
1
3
B
4
A
First front
side
0404YF220A.book 20 ページ 2009年8月20日 木曜日 午後1時26分
Содержание 0404
Страница 38: ...0404YF220A book 26 ページ 2009年8月20日 木曜日 午後1時26分 ...
Страница 47: ...0404YF220A book 1 ページ 2009年8月20日 木曜日 午後1時26分 ...
Страница 48: ...0404YF220A 0404YF220A 20090827MD 20090827MD ...