2.2 Unpacking
2-8
5
With the top of the back side pressed to an
inclined position, turn the rotation plates on both
sides of the back side as shown in the figure.
The casters on the back side are placed on the palette.
6
Install the slope by inserting the tenons (bar-
shaped projections) into the holes in the palette
on the front side.
7
Disassemble the buffer material removed in
and place it at the correct height under the
slope.
8
Remove the tape from two locations that fix the
rotation plates on both sides of the front side.
9
Press the first front side until it contacts the
stopper on the back side.
Rear
Caution
You can step on the installed slope while
carrying out the work. However, check again
that it is installed properly.
•
The tenons on the slope must be inserted
in the holes into the palette.
•
The buffer material is placed at the
correct height under the slope.
0404YF220A.book 8 ページ 2009年8月20日 木曜日 午後1時26分
Содержание 0404
Страница 38: ...0404YF220A book 26 ページ 2009年8月20日 木曜日 午後1時26分 ...
Страница 47: ...0404YF220A book 1 ページ 2009年8月20日 木曜日 午後1時26分 ...
Страница 48: ...0404YF220A 0404YF220A 20090827MD 20090827MD ...