UAB AMALVA we reserve the right to make changes without prior notice.
37
1. Air handling unit
2. Ducts connection
3. Sound attenuator
4. Rubber mat (not included
in unit set)
5. Holder (see. 3.1.2 Picture)
6. Ceiling holder (included
in unit set)
Unit holder is made of 2,5 mm galvanized steel sheets according to EN 10142.
Condensate Drain Connections
All condensate drain connections must be correctly trapped. Incorrect trapping can result in flooding within the unit
and consequent flooding of the immediate area. Fill the drain trap with water before starting up the unit.
All drain lines should be insulated where passing through any space where damage from condensation drip
might occur. If the unit is installed in unheated premises the condensate pipe should be heat-insulated and heated
with heating cable.
A condensate pipe and a drain trap
* RECU 400 - 1200, REGO 1200 - D=15 mm
RECU 1600 - 7000, REGO 1600 - 2500 - D=28 mm
3.2. Section-to-section joints
Section Connection Scheme
3.3. Heating coil connection*
Pipe work should be connected in accordance with good engineering practice. All pipe work must be adequately-
supported to ensure that no additional load is stressing the unit.
Mounting the pipes on the heating coil, tight the pipes with spanners. As shown in 3.3 Picture.
Fitting Pipes Connection
min. 60 mm
min. 30 mm
view 2
min. 60 mm
min. 30 mm
view 1
D*
D*
3.1.3 a Picture
3.1.3 b Picture
view 2
Air handling units REGO 3000, REGO 4000, REGO 4500, REGO 7000
and RECU 7000 are produced from three sections, and RECU 3000,
RECU 4000, RECU 4500 from two section. Separate sections are easy to
install on site. Ensure that sections or section assemblies are positioned
in their proper sequence and that the unit handing and reference is cor-
rect. Sections should be accurately aligned prior to bolting together using
the fixings and gaskets provided. The sealing gasket and fastening parts
are available with every air handling unit.
Incorrect installation will result in air leakage, air blow marks to the
unit casings and unacceptable noise. Section connection scheme is
shown in 3.2 Picture.
Drain scheme of Vertical Unit
Drain scheme of Horizontal Unit
3.3 Picture