EN
UAB AMALVA we reserve the right to make changes without prior notice.
36
100 mm
min. 700 mm
100 mm
min. 700 mm
3.1.1 b Picture
3.1.1 a Picture
REGO RECU unit Installation Scheme
1. Air handling unit
2. Air duct connections
3. Sound attenuator
4. Drain siphon (only RECU)
5. Rubber mat (not included in unit set)
OTK Maintenance space for unit
view
2
2
3
1
2
4
5
view 1
2
1
3
4
A
B
1
2
3
2
4
min. 700 mm
B
ceiling
A
5
min. 100 mm
min. 1800 mm
3.1.2 a Picture
3.1.2 b Picture
B
Floor
Minimum Maintenance Space for Horizontal Units
Minimum Maintenance Space for Vertical Units
B
A
5
3.1.2 c Picture*
* - only PE.
Содержание KOMPAKT OTK Series
Страница 2: ......