.
MAINTENANCE
MAINTENANCE PROCEDURE
EVERY 100 HOURS MAINTENANCE
Maintenance for every 50 hours service should be carried out at the same time.
LUBRICATING
NOTICE
If any abnormal noise is generated from any greasing point, carry out greasing regardless of the greasing interval.
Carry out greasing every 10 hours for the first 50 hours on a new machine.
After the machine was subjected to jobs in the water, be sure to grease the wet pins.
1. Set the machine to the greasing posture shown on the right,
lower the work equipment to the ground, then stop the engine.
2. Using a grease pump, pump in grease through the grease
fittings shown by arrows.
3. After greasing, wipe off any old grease that was pushed out.
(1) Boom cylinder rod pin (2 places)
(2) Arm cylinder foot pin (1 places)
(3) Boom-Arm coupling pin (1 place)
(4) Arm cylinder rod end (1 place)
(5) Bucket cylinder foot pin (1 place)
(6) Boom cylinder foot pin (2 places)
4 - 48
Содержание PC300-8
Страница 2: ...1 1...
Страница 12: ...2 1...
Страница 55: ......
Страница 56: ...3 1...
Страница 264: ...4 1...
Страница 312: ...MAINTENANCE MAINTENANCE PROCEDURE MAINTENANCE MAINTENANCE PROCEDURE 7 Boom foot pin 2 places 4 49...
Страница 347: ......
Страница 348: ...5 1...
Страница 351: ......
Страница 352: ...6 1...