.
OPERATION
TROUBLES AND ACTIONS
LIGHTWEIGHT TOWING HOLE
WARNING
The shackle must always be used.
Hold the wire rope level and direct it straight to the track frame.
Move the machine slowly and be careful not to apply any sudden load to the wire rope.
There is a hole in the track frame to fit the shackle when towing light
objects.
Permissible towing load:
Max. 108,000 N (11,000 kg)
SEVERE JOB CONDITION
When carrying out digging operations in water, if the work equipment mounting pin goes into the water, carry out
greasing every time the operation is carried out.
For heavy-duty operations and deep digging, carry out greasing of the work equipment mounting pins every time
before operation.
After greasing, operate the boom, arm and bucket several times, then grease again.
3 - 198
Содержание PC300-8
Страница 2: ...1 1...
Страница 12: ...2 1...
Страница 55: ......
Страница 56: ...3 1...
Страница 264: ...4 1...
Страница 312: ...MAINTENANCE MAINTENANCE PROCEDURE MAINTENANCE MAINTENANCE PROCEDURE 7 Boom foot pin 2 places 4 49...
Страница 347: ......
Страница 348: ...5 1...
Страница 351: ......
Страница 352: ...6 1...