MAINTENANCE PLAN
141
4.7
MAINTENANCE PLAN
4.7.1 WHEN REQUIRED
4.7.2 MAINTENANCE INTERVALS IN CASE OF USE OF THE DEMOLITION
HAMMER
4.7.3 CHECKS BEFORE STARTING
4.7.4 MAINTENANCE EVERY 10 HOURS OF OPERATION
N.
PART
OPERATION
PAGE
a
Air cleaner
Check, clean or change
145
b
Cab filter
Check and clean
147
c
A/C air recirculation filter
(only for machines with air conditioner)
Check and clean
148
d
Water separator
Clean
149
e
Tracks
Check and adjust tension
150
f
Tracks
Check shoe fastening
152
N.
PART
OPERATION
PAGE
a
Hydraulic oil drain filter
Change cartridge
153
b
Hydraulic oil
Change
153
N.
PART
OPERATION
PAGE
a
Various checks
—
154
b
Coolant
Check and top up
154
c
Fuel tank
Check and top up
155
d
Engine oil pan
Check and top up
155
e
Hydraulic oil tank
Check and top up
156
f
Water separator
Drain water
157
N.
PART
OPERATION
PAGE
a
Joints
Lubricate
158
Содержание PC110R-1
Страница 2: ......
Страница 19: ...17 SAFETY AND ACCIDENT PREVENTION...
Страница 51: ...49 THE MACHINE AND ITS OPERATIONS...
Страница 126: ...124 PAGE INTENTIONALLY LEFT BLANK...
Страница 127: ...125 MAINTENANCE...
Страница 190: ...188 PAGE INTENTIONALLY LEFT BLANK...
Страница 191: ...189 TECHNICAL SPECIFICATIONS...
Страница 198: ...196 PAGE INTENTIONALLY LEFT BLANK...
Страница 199: ...197 AUTHORISED OPTIONAL EQUIPMENT...