Unit: mm
Fig.#8
250
10
250
10
200
5
85
5
305
01
05
1
01
05
1
Fig.#10
Bolt
Mark symbol
Hole(two sides)
C. 1.
Confirm the drain hole center and mark down the“+”centerline
perpendicular to the finished wall.
2.
Confirm the toilet drain hole center and mark down the centerline on
Front , back , left and right outside of toilet.
3.
Make sure the toilet side mark symbol is align to the drain hole
centerline on the finished floor.Mark down the left and right holes.
305mm
3/8
10mm
Fig.#9
D.
Drill two
holes and insert plastic inserts and T-bolts (Purchased by customer)
1332623-T01-H
6
Kohler Co.