2. Install the Rough Plumbing
NOTE:
Provide access to all plumbing connections to simplify future maintenance. Include access at the
back of the plumbing wall whenever possible.
NOTE:
Locate the drain before the bath is installed. Install the overflow and drain according to the
manufacturer’s instructions. Refer to the
″
Roughing-In
″
section to locate the drain line and trap.
Locate the rough plumbing for the drain according to the roughing-in dimensions.
Position the water supply pipes according to the roughing-in information. Cap the supplies and
check for leaks.
Strap the supply connections to the stud framing.
Install the shower valving according to the manufacturer’s instructions. Do not install the trim at
this time.
Shower Elbow
Blocking
Shower Riser
Supply Valves
Blocking
Spout Elbow
Supply Lines
81-3/4"
(207.6 cm)
Min.
Optional
19-1/4"
(48.9 cm)
Min.
Shower Elbow
Blocking
Shower Riser
Supply Valves
Blocking
Spout Elbow
Supply Lines
79-1/2"
(201.9 cm)
Min.
Optional
17"
(43.2 cm)
Min.
14"
(35.6 cm)
9-1/8"
(23.2 cm)
Series 7104
with “Through the Floor” Drain
Series 7104
with “Above the Floor” Drain
Drain Cutout
Drain
Cutout
Sterling
7
1015404-2-D
Содержание Sterling 7104 Series
Страница 41: ...1015404 2 D ...
Страница 42: ...1015404 2 D ...
Страница 43: ...1015404 2 D ...
Страница 44: ...Phone 1 888 STERLING 1 888 783 7546 Mexico 001 877 680 1310 SterlingPlumbing com 2006 by Kohler Co 1015404 2 D ...