![Kohler Sterling 7104 Series Скачать руководство пользователя страница 6](http://html.mh-extra.com/html/kohler/sterling-7104-series/sterling-7104-series_installation-manual_1987128006.webp)
Framing Construction (cont.)
NOTE:
The bath supports must rest directly on a level subfloor.
Build a dam to keep the flooring material in the desired area. Be sure to dam the drain area.
Spread and level a layer of cement or mortar on the subfloor where the bath supports will rest.
Allow the cement or mortar material to cure.
Remove the dam.
1015404-2-D
6
Sterling
Содержание Sterling 7104 Series
Страница 41: ...1015404 2 D ...
Страница 42: ...1015404 2 D ...
Страница 43: ...1015404 2 D ...
Страница 44: ...Phone 1 888 STERLING 1 888 783 7546 Mexico 001 877 680 1310 SterlingPlumbing com 2006 by Kohler Co 1015404 2 D ...