10
1058907-W2-J
Thermotap-3 Installation
'O' Seal
30 mm
Maximum
Backplate
(Reverse to suit
smaller basin hole)
Fixing Nuts
Rigid Tail
option
Washer
Checkvalve
Assembly
Strainer
Isolating
Valve
Fixing Studs
26 to 36 mm
Diameter
Union Nut
Flexible
Tail option
Installation
1.
Screw the fixing studs fully into the
Thermotap-3 body.
2.
Place the 'O' seal in the groove in
the base of the Thermotap-3 body.
3.
Place either rigid or flexible inlet
tail through one of the larger holes
in the backplate, orientate the
backplate to suit the hole size in
the basin.
5.
Working underneath the basin
offer the inlet tail up through the
hole in the basin.
4.
Screw inlet tail (if using flexible
type, red coloured hose) into the
Thermotap-3, hole marked with a
RED label (nearest the spout) and
tighten. Position tap on basin.
5.
Pull the backplate over the fixing
studs.
6.
Working underneath the basin,
locate other inlet tail (blue
coloured flexible hose)through
backplate then screw and tighten
into remaining hole in tap, spread
tails apart slightly if necessary to
assist in fitting.
7.
Make sure that the Thermotap-3
is correctly positioned and screw
the fixing nuts onto the fixing
studs. Tighten the fixing nuts
until the tap is secure. DO NOT
OVERTIGHTEN.
8.
Connect the isolating valves
to the supply pipework. Fit the strainer into the isolating valve and screw in
the checkvalve housing. Use a suitable spanner to tighten the checkvalve
assemblies.
9.
Locate the sealing washers inside the nuts on the inlet tails and screw onto the
checkvalve assemblies. Please ensure that the inlet tail (red coloured flexible
hose) previously connected to hole marked with a RED label is connected to
hot supply. Use a suitable spanner to tighten the union nuts.
10.
Restore the water supplies and check all connections are watertight. Refer to
section
'Commissioning'
.