background image

Tools

Before You Begin

Product Requirement

CAUTION : Risk of product damage.

 Do not lift the bath by the piping or pump, or use the piping or pump 

 for structural support of the bath.

□  We recommend this bath for drop-in.
□  Inspect the bath for damage before you begin installation.
□  You must install this bath to an adequately supported, level subfloor.
□  Confirm adequate support for a rim-mounted faucet, large faucets that may be inadvertently used as a means 

 

  of support are not appropriate or safe for this installation.

Plus:
•  Conventional woodworking or 
  concrete installation tools and materials
•  Drop cloth

Silicone Sealant

Measuring Tape

Level

Pencil

Pipe Wrench

Safety Glasses

A.  Summary of Key Requirements

□  Observe all local plumbing codes.
□  Install the unit to a level subfloor.
□  Provide properly-dimensioned framing.

B.  Plumbing Specifications

If using a rim-mounted bath faucet, flexible connections between the valves and spout may be required. Confirm 

adequate mounting, connection space of specified faucet for your installation.

C.  Product Inspection

Carefully unpack and inspect the bath with airjets for damage. Leave all materials in the carton during constructions 

 

to prevent damage.

D.  Electrical Requirements

The installation must have a Earth-Leakage Circuit-Breaker (ELCB). The ELCB protects against Line-to-ground 

 

shock hazard. Use a 220-240 V, 20 A (minimum), 50/60 Hz dedicated service for the bath with airjets.

E.  Connections and Service Access

Before installation, ensure proper access to the final connections.

NOTICE : 

Provide generous, unrestricted service access to the pump. You must provide access for servicing 

 

the  pump  and  controls.  The  access  must  be  located  immediately  next  to  the  pump.  Study  the  roughing-in 

 

information packed with the whirlpool (the size of access panel should not less than 500 x 450 mm).

Kohler Co. 

1241693-X2-B

Содержание K-97260X

Страница 1: ...Installation and Care Guide Dual System Bath 1241693 X2 A 2018 Kohler Co K 97260X...

Страница 2: ...al before you start installation If you encounter any installation or performance problems please call 0 2204 6222 for Call Center Thailand Thank you again for choosing Kohler Company Important Inform...

Страница 3: ...ing Specifications If using a rim mounted bath faucet flexible connections between the valves and spout may be required Confirm adequate mounting connection space of specified faucet for your installa...

Страница 4: ...d level This bath may be installed next to the wall or in an island installation An island installation requires a four side surround In both instances make sure the deck is supported by brick or conc...

Страница 5: ...and resting on all support blocks Install the drain to the bath according to the drain manufacturer s instructions Do not connect the trap at this time To adjust the height loosen the nut A adjust th...

Страница 6: ...t carrying conductor Follow local electrical codes Bond in accordance with national and local codes N N E L L E Control Box Power Supply LINE LOAD OFF ON 2 P 20 A 120 240V 50 60 Hz SENSITIVITY 15 mA O...

Страница 7: ...it will be required NOTE Hose connection to manifold is factory fitted Push the rubber cuff onto blower nozzle and secure in position with hose clip Connect the blower to the control box Hose Clip Con...

Страница 8: ...he flow Press the Power On Off button a second time to turn the bath off NOTE The water temperature in the bath should not exceed 40 C 104 F The heater will automatically turn off as the water tempera...

Страница 9: ...ater ensuring that the water level 40mm above spa jets After you press Motor pump heater on off the water level indicator will light in green Fill the bath with warm water ensuring that the water leve...

Страница 10: ...y operate for 5 seconds if insufficient water level is detected automatically shutting down G Leakage Detection Leakage Detection indicator When the fixture is powered on and the bath has run out of w...

Страница 11: ...ck wire connections If necessary replace user keypad B User keypad does not work B Replace user keypad C Pump does not work C Replace pump D Controller does not work D Replace the controller Troublesh...

Страница 12: ...0 2204 6222 Earth Ground ELCB 1241693 X2 B 12 Kohler Co...

Страница 13: ...ELCB 220 240 20 50 60 50x 45 Kohler Co 13 1241693 X2 B...

Страница 14: ...390 15 0 4 2 5 4 2 1 2 300 400 2 1500 500 700 Brick 2 1241693 X2 B 14 Kohler Co...

Страница 15: ...A B A 560 600 A B A B Kohler Co 15 1241693 X2 B...

Страница 16: ...20 50 60 ELCB 15 ELCB Class 1 GB 4706 1 2005 N N E L L E LINE LOAD OFF ON 2 P 20 A 120 240V 50 60 Hz SENSITIVITY 15 mA OPERATING TIME MAX 0 1s TEST BUTTON LEAKAGE INDICATOR INPUT OUTPUT 1241693 X2 B...

Страница 17: ...1 5 1 5 Kohler Co 17 1241693 X2 B...

Страница 18: ...40 40 C 104 F 40 C 104 F 40 1241693 X2 B 18 Kohler Co...

Страница 19: ...40 Power Water Fault ON OFF AUTO SANITISING CYCLE OSCILLATING CYCLE PRESS BOTH Power Water Fault Power Water Fault 40 ON OFF ON OFF Kohler Co 19 1241693 X2 B...

Страница 20: ...1 2 3 20 2 30 5 3 3 Power Water Fault 1241693 X2 B 20 Kohler Co...

Страница 21: ...1 ELCB 2 30 ELCB ELCB 3 30 4 5 6 Kohler Co 21 1241693 X2 B...

Страница 22: ...1241693 X2 B Kohler Co...

Страница 23: ...Kohler Co 1241693 X2 B...

Страница 24: ...ILAND PUBLIC COMPANY LIMITED 16th FL JasmineCityBldg 2 Soi Sukhumvit23 Sukhumvit Road Wattana Bangkok Thailand 10110 Call Center Tel 66 2204 6222 Fax 66 22046224 ASIA CUSTOMER SERVICE CENTRE No 158 Ji...

Отзывы: