background image

HiQu Digital Bath

installation instructions

Page 1

HiQu

Digital

Bath

Installation guide

Summary of Contents for HiQu

Page 1: ...HiQu Digital Bath installation instructions Page 1 HiQu Digital Bath Installation guide...

Page 2: ...HiQu Digital Bath installation instructions Page 2 HiQu Digital Digital Bath HiQu Digital Bath...

Page 3: ...Components HP Combi Literature not shown Literature not shown Components Gravity Pumped HiQu Digital Bath installation instructions Page 3...

Page 4: ...rthed Cables which are chased into the wall must be protected by a suitably sized conduit or sheathing to allow for removal in the event of service and maintenance purposes Ensure that the conduit is...

Page 5: ...n ended 2 5 bar pump should be used The minimum actual capacity of the cold water storage cistern should be not less than 225 litres 50 gallons The capacity of the hot water cylinder must be capable o...

Page 6: ...t is essential that the written in structions overleaf are read and understood and that you have all the necessary components shown overleaf before com mencing installation The HiQu Digital Bath syste...

Page 7: ...indicate direction of flow Compression fittings should not be used on the inlet and outlet spigots and may affect warranty if fitted Choose the position for your Digital processor as close to the bath...

Page 8: ...y pipes 5 The maximum hot water inlet temperature must be no more than 65 C Attach the supply pipes to the Digital processor ensuring that the cold and hot feeds are fitted into the appropriately mark...

Page 9: ...set aside 8 Place the bath control back plate onto the finished wall surface in the desired location and mark the fixing and data cable entry points 9 Connect the data cable to the rear of the control...

Page 10: ...BEFORE ANY ELECTRICAL ADJUSTMENT IS ATTEMPTED THE ELECTRICITY SUPPLY MUST BE TURNED OFF AT THE MAINS SWITCH ELECTRICAL INSTALLATION MAY ONLY BE CARRIED OUT BY A QUALIFIED PERSON Connect the outlet pi...

Page 11: ...recommend protecting surface mounted cables in suitable ap proved conduit to avoid the risk of damage from vermin The data cable and power lead should also be clipped in place with P clips or similar...

Page 12: ...N BOILER SYSTEMS For Standard Digital processors installed on combi boiler systems for op timum performance we recommend setting the flow rate to the COMBI mode 18 N B The ECO flow rate mode should no...

Page 13: ...t bladed screwdriver using the MAX TEMP ADJUSTMENT control as indicated When the temperature has been set to the desired position carefully replace the Digi tal processor lid and secure the fixing han...

Page 14: ...purposes The company reserves the right to alter change or modify the product specifications without prior warning Registered Trademark Aqualisa Products Limited The Waste Electrical and Electronic E...

Reviews: