-10-
Step Four:
Take down the wiring cover plate. Insert the power cord
and 2 signal lines into the wire terminals. Tighten the
terminal screws and fix the lines. Finally, mount the wiring
cover plate.
3
2
Power Cord
Terminal
Wire Box Cover
L
N
Signal Line
Step Five:
Put the ventilation outlet assembly onto the plasterboard
celling, and push the machine into the install hole. Hang
the ventilation outlet hook over the rut inside the bathroom
heater body. Put the hanger inside the flanged sinking
groove of the body.
Power Cord
Mounting Hole
Ventilation Outlet Assembly
Plasterboard Ceiling
Plasterboard Ceiling
Push Into The Install Hole
Flanged Sinking Groove
Hanger
Machine
Rut
Ventilation Outlet Hook
Step Six:
Use 4 BTP4*10 triangular self-tapping screws to lock the
body and the hanger. Use one ST4.2*10 self-tapping screw
to fix the machine and ventilation outlet assembly. Next,
cover the decorative screw case.
BTP4*10
(4
)
ST4.2*10
(1
)
Decorative Screw Case
Decorative
Screw Case
BTP4*10 Triangular
Self-tapping Screw(Four)
BTP4*10
(4
)
ST4.2*10
Self-tapping
Screw(One)
ST4.2*10
(1
)
1324694-T01-C