background image

-14-

USER'S GUIDE

A. Button Function

A.

B. Time Setting

Under the heater mode, there is a delay of 20 secs after
the heater mode is stopped or switched to fan or
ventilation mode.
Under the fan mode, there is a delay of 3 secs after the
fan mode is stopped or switched to heater or ventilation
mode.
Under the ventilation mode, there is a delay of 3 secs
after the ventilation mode is stopped or switched to heater
or fan mode.
The defaulted duration time of heater, fan and ventilation
mode is 2 hrs.

!

!

!

!

B.

"

"

"

"

"

"

20

"

"

"

"

"

"

3

"

"

"

"

"

"

3

"

"

"

"

"

2

!

!

!

!

TROUBLESHOOTING

Problem

Diagnosis

Solution

Bathroom heater does not
work.

Wall controller break down.

A. Power failure.

D. The signal line route is interrupted.

B. Disconnected power cord.

A. The pilot lamp does not turn on.

C. Circuit breaker is

off

.

B. Fail to control the bathroom heater.

A. Wait until the power is restored.

D. Check the signal line route and ensure that it

is connected properly.

B. Connect the power cord into the junction box

of bathroom heater properly.

A. Ensure that the signal line is connected

properly.

C. Turn on the power at the breaker.

B. Connect the signal line and the bathroom

heater properly.

A.

D.

B.

A.

C.

B.

A.

D.

B.

A.

C.

B.

Heater: Turn on/off or switch to the heater mode.

/

"

"

"

"

Fan: Turn on/off or switch to the fan mode.

/

"

"

"

"

Ventilation

Turn on/off or switch to the ventilation mode.

/

"

"

"

"

Air Flow: Switch the air flow to fixed flow or swing flow (defaulted).

1324694-T01-C

Содержание K-77404T-G-0

Страница 1: ...tion and Homeowners Guide Underscore Bathroom Heater S300G S300G K 77404T G 0 KOHLER CHINA INVESTMENT CO LTD NO 158 JIANG CHANG SAN ROAD JING AN DISTRICT SHANGHAI PRC POST CODE 200436 158 200436 13246...

Страница 2: ...uct complies with GB 4706 1 2005 GB4706 23 2007 and GB 4706 27 2008 please leave instructions for the consumer GB 4706 1 2005 GB4706 23 2007 GB 4706 27 2008 WARNING Risk of electrical shock WARNING Ri...

Страница 3: ...4 Wall Controller IPX4 K 77404T G 0 K 77404T G 0 SIMPLIFIED DIAGRAM OF THE UNIT Note Plaster or other ceiling opening dimension 275 X 275 mm 275 X 275 mm 5 0 5 0 5 0 5 0 BTP4 8 Triangular Self Tapping...

Страница 4: ...he insulation of power cord Copper cord must be inserted into the pillar terminal hole and make sure all the cords under the terminal are inserted into the pillar terminal completely Suggest using a p...

Страница 5: ...e bathroom heater by a ventilation outlet assembly and then fix it with a clamp 3 Make a Mounting Hole Fix the position to install the bathroom heater and then drill a 275 275 hole with an install tem...

Страница 6: ...300mm Expansion Pipe M6 Screw Rod M6 M6 Butterfly Nut M6 M6 Washer M6 M6 Spring Washer M6 M6 Nut M6 Hanger Triangular Self tapping Screw BTP4 10 Ventilation Outlet ST4 2 10 Self Tapping Screw ST4 2 10...

Страница 7: ...kg in load for batten installing method 200mm 200mm 300mm 1000mm M6 25 Air Exhaust Pipe Wall Lower than 1000mm 1000 300mm above 300 300mm above 300 Air Outlet Window Bathroom Heater 1 Installation of...

Страница 8: ...tch hinge and push the other end next Demount the decorative screw case from the base M4 M6 Butterfly Nut M6 6 Washer 6 6 Spring Washer 6 M6 Nut M6 Plasterboard Ceiling Plasterboard Ceiling Attach Han...

Страница 9: ...t Ventilation Outlet Hook Step Six Use 4 BTP4 10 triangular self tapping screws to lock the machine and mounting hanger Use one ST4 2 10 self tapping screw to fix the machine and ventilation outlet as...

Страница 10: ...rboard Ceiling Ventilation Outlet Assembly Batten Batten Plasterboard Ceiling Batten Step Two Fix two hangers on the batten with M4 cross countersunk head self tapping screws Shown as the figures belo...

Страница 11: ...r body Put the hanger inside the flanged sinking groove of the body Power Cord Mounting Hole Ventilation Outlet Assembly Plasterboard Ceiling Plasterboard Ceiling Push Into The Install Hole Flanged Si...

Страница 12: ...o the position of the labelled boom fix the M6 screw rod on the cerement board and attach the hanger to the M6 screw rod The hanger is required to flatten the plasterboard shown as the figures M6 M6 I...

Страница 13: ...nd mounting hanger Step Five Take down the wiring cover plate Insert the power cord and 2 signal lines into the wire terminals Tighten the terminal screws and fix the lines Finally mount the wiring co...

Страница 14: ...p Three to fix the panel and machine Installation Finished M6 ST4 2 10 1 M4 10 ST4 2 10 Self tapping Screw One ST4 2 10 1 M4 10 Screw Two M4 10 WALL CONTROLLER INSTALLATION Fix the wall controller fra...

Страница 15: ...controller break down A Power failure D The signal line route is interrupted B Disconnected power cord A The pilot lamp does not turn on C Circuit breaker is off B Fail to control the bathroom heater...

Страница 16: ...without help Please remember that the checking and repairs done by users themselves could easily cause damage to the machine or cause physical harm to the person 1 220V 2 3 4 5 6 1 2 3 4 5 6 7 8 9 1...

Отзывы: