3. Installation of Main Body without Suspended Ceiling
Step One:
Take out the install template. Bend the template till 90 and
push it to the cement board at the point of which the M6
screw rod is marked. After that, based on the marked point
of M6 screw rod, make the hole at the cerement board.
o
3.
90
M6
M6
Step Two:
According to the position of the labelled boom, fix the M6
screw rod on the cerement board, and attach the hanger to
the M6 screw rod. (The hanger is required to flatten the
plasterboard, shown as the figures)
M6
M6
(
)
Install Template
Cement Board
Cement Board
M6 Butterfly Nut
M6
6 Washer
6
6 Spring Washer
6
M6 Nut
M6
Screw Rod
Step Seven:
Install the panel and tighten the two M4*10 screws, which
were disassembled in Step Three, to fix the panel and the
body. (Installation Finished)
M4*10
(
)
(
)
Plasterboard Ceiling
M4*10
(
)
M4*10 Screw(Two)