-6-
INSTALLATION
Caution before installation:
!
!
!
!
!
!
!
The installed product must be 200mm or above away from
curtains or other combustible materials.
The distance between the ceiling where the product is
mounted and the roof shall be 200mm or above.
Ensure that the gap between the product edge and the
wall is 300mm or above.
The power cord to the product shall have enough length
for the installation.
The distance between the product and the air outlet
window shall be 1000mm or lower.
Cut the screw rod(M6) to suit the distance between the
ceiling and the roof.
Plaster ceiling is required to afford at least 25kg in load for
batten installing method.
!
!
!
!
!
!
!
200mm
200mm
300mm
1000mm
(M6)
25
Air Exhaust Pipe
Wall
Lower than 1000mm
1000
300mm above
300
300mm above
300
Air Outlet Window
Bathroom Heater
1. Installation of Main Body for Plaster Ceiling Method
One(Suggested)
Step One:
Take out the install template. Bend the template till 90 and
push it from the two sides of ventilation outlet assembly to
the cement board at the point of which the M6 screw rod is
marked. Finally, based on the marked point of M6 screw
rod, make the hole at the cerement board.
o
1.
(
)
90
M6
M6
Mounting Hole
Mounting Hole
1
2
Ventilation Outlet Assembly
Ventilation Outlet Assembly
Plasterboard Ceiling
Plasterboard Ceiling
Marked Hole
Marked Hole
Install Template
Install Template
Bending line
Install Template
Cement Board
120
270
1324694-T01-C