4. Secure the Vanity
Position the vanity against the finished wall.
Verify the vanity is level and plumb.
NOTE:
If the vanity is not level, tip the vanity to allow access to the
appropriate leveler(s) and turn the leveler(s) counterclockwise to
raise the vanity, or clockwise to lower it.
Mark two pilot holes an equal distance from the centerpoint of
the mounting rail.
Drill two pilot holes through the mounting rail at the marked
locations.
NOTE:
Use fasteners rated at 50 lb (22.68 kg) load bearing to
properly secure the vanity to the finished wall.
Insert a fastener through each of the two drilled holes.
Tighten each fastener until the vanity is flush and secure against
the finished wall.
Leveler
Mounting Rail
Fastener
Vanity
Finished Wall
Kohler Co.
7
1082745-2-A
Содержание K-2515
Страница 19: ...Installer le Lavabo cont Raccorder le drain et les alimentations Kohler Co Français 9 1082745 2 A ...
Страница 30: ...Instale el lavabo cont Conecte el desagüe y los suministros 1082745 2 A Español 9 Kohler Co ...
Страница 33: ...1082745 2 A ...
Страница 34: ...1082745 2 A ...
Страница 35: ...1082745 2 A ...
Страница 36: ...USA 1 800 4 KOHLER Canada 1 800 964 5590 México 001 877 680 1310 kohler com 2007 Kohler Co 1082745 2 A ...