2. Install the Valve
CAUTION: Risk of product damage.
Remove the plaster guards
and valve/diverter units applying heat to the yoke.
NOTE:
For ceiling supply lines, install the yoke with the supply
inlets facing up.
For 1/2” Pipe Connections:
Apply sealant tape to the pipe threads.
Slide the nut over the pipe.
Secure the 1/2
″
adapter to the pipe.
Secure the nut to the yoke.
For Copper Tubing Connections With Adapter:
Slide the nut over the copper tubing.
Solder the adapter to the tubing.
Secure the nut to the yoke.
For Copper Tubing Connections with Direct Sweat Inlets:
Remove the plaster guards and valve/diverter units from the
yoke.
Solder the tubing to the yoke inlet.
Valve
Unit
Plaster
Guard
Nut
1/2"
Adapter
1/2" Pipe
Connections
Copper Tubing
Connections
(with Adapter)
Copper Tubing
Connections (with
Direct Sweat Inlets)
1/2" Pipe
Copper Tubing
Adapter
Nut
1/2" Copper
Tubing
Solder
Solder
1/2" Copper
Tubing
113728-2-AC
4
Kohler Co.
Содержание K-11618
Страница 7: ...Install the Spout cont Remove all excess putty Kohler Co 7 113728 2 AC ...
Страница 10: ...Complete the Installation cont Run the water for about a minute and turn off 113728 2 AC 10 Kohler Co ...
Страница 29: ...113728 2 AC ...
Страница 30: ...113728 2 AC ...
Страница 31: ...113728 2 AC ...
Страница 32: ...USA 1 800 4 KOHLER Canada 1 800 964 5590 México 001 877 680 1310 kohler com 2005 Kohler Co 113728 2 AC ...