10 Scheduled Maintenance
TP-6334
9/04
Engine Service.
Perform generator set engine service
at the intervals specified by the engine operation
manual.
Generator Set Service.
Perform generator set service
at the intervals specified by the generator set operation
manual.
If the generator set operates under dusty or dirty
conditions, use
dry
compressed air to blow dust out of
the alternator. With the generator set running, direct the
stream of air in through the cooling slots at the alternator
end.
Routine Maintenance.
Refer to the following generator
set service schedule, the engine service schedule, and
the runtime hours shown on the ADC2100 to determine
when to schedule routine maintenance. Service more
frequently generator sets that are subject to extreme
weather or dusty or dirty conditions.
Service Log.
Use the Operating Hour Service Log
located in the back of this manual to document
performed services.
Service Schedule.
Perform maintenance on each item
in the service schedule at the designated intervals for
the life of the generator set.
For example, an item
requiring service every 100 hours or 3 months also
requires service after 200 hours or 6 months, 300 hours
or 9 months, and so on.
3.2 Service Schedule
Perform Service at Intervals Indicated (X)
Reference
Section
Before
Starting
After
50 Hrs
or
1 Month
Every
100 Hrs
or
3 Months
Every
300 Hrs
or
6 Months
Every
500 Hrs
or
Yearly
FUEL SYSTEM
Check the fuel level and fill as necessary
2.1
X
Replace the gasoline fuel filter *
X
(400 hrs)
Check the solenoid valve operation (LP vapor) *
X
(Weekly)
Check the fuel lines and replace as necessary *
X
LUBRICATION SYSTEM
Check the crankcase oil level and add oil as
necessary
3.3.2
X
Replace the oil in the crankcase
3.3.4
X
(200 hrs)
Replace the lube oil filter element
3.3.5
X
(200 hrs)
COOLING SYSTEM
Check the coolant level and fill as necessary
3.8.1
X
Inspect the radiator and hoses
3.8.1
X
(Weekly)
Check the belt tension and condition *
3.11
X
Check the coolant protection and tighten the hose
clamps *
3.8.1
X
(400 hrs)
Flush the cooling system *
3.8.4
X
(800 hrs)
IGNITION SYSTEM
Clean and regap the spark plugs
3.9
X
Replace the spark plugs
3.9
X
(800 hrs)
*
Consult your local distributor/dealer for service.
Содержание 10ERG
Страница 1: ...Commercial Mobile Generator Sets Model 10ERG 13ERG 15ERG TP 6334 9 04 Operation...
Страница 4: ......
Страница 10: ...VI Safety Precautions and Instructions TP 6334 9 04 Notes...
Страница 14: ...TP 6334 9 04 2 Service Views Notes...
Страница 20: ...8 Operation TP 6334 9 04 Notes...
Страница 38: ...TP 6334 9 04 26 Section 5 Wiring Diagrams GM28747A C Figure 5 1 Wiring Diagram Sheet 1 of 2...
Страница 39: ...TP 6334 9 04 27 Section 5 Wiring Diagrams GM28747B C Figure 5 2 Wiring Diagram Sheet 2 of 2...
Страница 40: ...TP 6334 9 04 28 Section 5 Wiring Diagrams ADV6846A A Figure 5 3 Schematic Diagram Sheet 1 of 2...
Страница 41: ...TP 6334 9 04 29 Section 5 Wiring Diagrams ADV6846B A Figure 5 4 Schematic Diagram Sheet 2 of 2...
Страница 42: ...TP 6334 9 04 30 Section 5 Wiring Diagrams GM33846 A Figure 5 5 Accessory Wiring Diagram...
Страница 46: ......
Страница 47: ......