6
A-62051 May 2008
Start-up Procedures
Daily start-up
Follow these procedures when starting up the Archive Processor at the
beginning of the day, assuming that the Archive Processor was
properly shut down.
Uncovering the processing
section
• Lift the processing section cover until it is in an upright position.
The inside of the Archive Processor is shown below without racks.
Dryer Section
(Rack #7)
Wash (Rack #6)
Fixer Tanks
(Racks #4 and 5)
Wash (Rack #3)
Developer Tank
(Racks #1 and 2)