A-62051 May 2008
9
Installing the processing
racks
1. Make sure that the rollers of each rack turn freely when you rotate
the drive gear.
2. Drain off any excess water if the racks were left submerged in water
since the last time film was processed.
3. Hold the gear cover back and lower the processing racks into the
processor (#6 rack first, then #5, #4, #3, #2, and #1).
The rack number is located just above the drive gear.
CAUTION: Lower the racks slowly and carefully into the
Archive Processor to avoid splashing any chemicals.
Installing the dryer rack
1. Lift off the dryer section cover.
2. Make sure that the rollers of the dryer rack turn freely when rotating
the drive gear.
3. Pull the gear cover back and lower the dryer rack into the dryer
section.
4. Replace the dryer section cover.
Rack #6
Gear Cover
Gear Cover
Dryer Rack (#7)
Dryer Section Cover