Operating manual Energy storage solutions
V1.3DE/EN
29
5
Commissioning
English
5.7
Conditioning the Energy storage solution
Basic information
• If the Energy storage solution has been de-energised for more than 1 year, it must
be conditioned. Failure to do this may result in the Energy storage solution being
damaged when the main supply voltage is switched on.
• The date of manufacture is on the model plate (
• During conditioning, the Energy storage solution is connected to the DC link but
is not ready for use.
Fig. 16: Conditioning time, depending on the voltage-free period
The commissioning
procedure
Connect the Energy storage solution to the DC link
(
The Energy storage solution will be conditioned (charged up).
Wait for the duration of the conditioning period which corresponds to the length
of the voltage-free period (
The application can then be enabled again.
Voltage-free time [years]
Conditioning
5
4
3
2
1
1
2
3
4
5
time [h]
Содержание 2.0 Series
Страница 79: ...Operating manual Energy storage solutions V1 3DE EN 37 Notes English ...
Страница 80: ......