25
5. Installation
5.1 Selection of qualified personnel
We recommend having the grinding machine installed by trained KNECHT
personnel.
We assume no liability for damage caused by improper installation.
CAUTION
5.2 Installation site
When determining the installation site, bear in mind the space required for installation, main-
tenance and repair work on the grinding machine (see Chapter 3.2). The machine may only be
stored or operated in dry rooms.
5.3 Supply connections
The grinding machine is delivered ready for connection with the appropriate connection cable.
Have a qualified electrician on site install the current supply.
Have a qualified technician on site install the compressed air supply.
Connect compressed air only when the doors are closed.
Never cut off the compressed air while the knives are clamped.
This can result in serious injuries.
CAUTION
5.4 Settings
The various components and the electrical system are adjusted by KNECHT Maschinenbau GmbH
prior to delivery.
ATTENTION
Unauthorized changes to set values are not
permitted and may damage the grinding
machine