Novar 1xxx
KMB systems
52
4.10 Text Messages
In the measurement value display mode, a text message may appear in some situations instead of the
instantaneous power factor value. Table 4.10 shows a list of these messages.
Table 4.10: List of text messages
message
meaning
comment
AHOy
AHOy
AHOy
AHOy
TEST
TEST
TEST
TEST
initial sequence after power up or initialization
controller carries out self-
diagnostics
N206
N206
N206
N206
- type of controller
1
11
1
.
2
22
2
- firmware version
U=Ln
U=Ln
U=Ln
U=Ln
- type of measurement voltage specified (phase,
phase-neutral)
parameter 15
I=5A
I=5A
I=5A
I=5A
- metering current transformer nominal secondary
value specified
parameter 13
U=0
U=0
U=0
U=0
measurement voltage not present or its fundamental
harmonic component lower than minimum value
controller in waiting mode
I=0
I=0
I=0
I=0
measurement current absent or lower than minimum
value
controller in waiting mode
APnn
APnn
APnn
APnn
automatic connection configuration detection
process in progress
process can have 1 to 7 steps
P=0
P=0
P=0
P=0
automatic connection configuration detection
process has failed and method of connection of
measurement voltage and current (parameter 16)
has not been defined
automatic connection
configuration detection process
will run again in about 15 minutes
automatically or parameter 16
value can be entered manually
AC-n
AC-n
AC-n
AC-n
automatic section power recognition process in
progress
process can have 3 or 6 steps
C=0
C=0
C=0
C=0
no capacitors have been successfully detected in
automatic section power recognition process or
in manual section value specification mode
(parameter 20), parameters 21 through 26 have not
been set properly or
all capacitive sections have been automatically
disabled because of error (parameter 25) or they are
set as fixed (parameter 26)
if automatic section power
recognition process is set, it will
be automatically repeated in
about 15 minutes or you can
specify values of parameters 21
through 26 manually
Содержание NOVAR-1 Series
Страница 66: ...Novar 1xxx KMB systems 66 Novar1106 installation...
Страница 67: ...Novar 1xxx KMB systems 67 Novar1114 installation...
Страница 68: ...Novar 1xxx KMB systems 68 Novar1206 installation low voltage measurement...
Страница 69: ...Novar 1xxx KMB systems 69 Novar1214 installation high voltage measurement...
Страница 70: ...Novar 1xxx KMB systems 70 Novar1114 S400 installation...
Страница 71: ...Novar 1xxx KMB systems 71 Novar 1214 S400 installation controller and contactors supllied from DC...
Страница 72: ...Novar 1xxx KMB systems 72 Novar1312 installation hybrid system with both thyristor switches and contactors...
Страница 73: ...Novar 1xxx KMB systems 73 Novar1414 installation low voltage measurement...