ELECTRODE HUMIDIFIER FILL VALVE REPLACEMENT
Step 4
Installing new Fill Valve
1.
If necessary, reposition valve
m
s metal bracket by
sliding it out. By pulling the solenoid out of the
valve, you may orient the terminals in a more con-
venient direction.
2.
Place new Fill Valve into port.
3.
Use provided machine screws (replacing those
removed in Step 3) to fasten the valve onto the wall
of the unit.
4.
Screw fitting back onto valve.
Step 5
1.
Place spring clamp (provided) onto hose.
2.
Slide hose onto valve, then slide spring clamp
around valve nozzle. Ensure that the clamp is tight
around the valve to avoid leaks.
3.
Reconnect wires to solenoid.
Step 6
1.
Restart unit. Observe components and connec-
tions for leaks.