Installation & Operation Manual:
Automated Forklift Entryway Sanitizing System
_________________________________________________________________________________________________
16 |
P a g e
sensor cable to the pump system using the M12 connector. Hand tighten only. Coil
excess cable and tie out of harms way using the magnet mounts and ties
14.
At the front of the forklift, find a location to install the 3
rd
branch T. Usually between the
mast and the front of the forklift body. (Figure 17)
Figure 17
Cut the tubing and install the branch T, then use the tubing and the magnetic mounts and
plastic ties to route each end of the branch T to the front spray nozzles. Connect the front
spray nozzles just as you connected the rear nozzles, leaving some slack if possible, to
allow adjustment of the nozzles.
15.
Install a fully charged battery pack.
16.
Once the installation is complete, walk around and check to make sure all tubing is routed
and secured properly. Open and close any engine compartment doors or access covers,
slide the seat fully forward and backward, and make sure there are no interferences with
tubing or components. (Figure 18) (Figure 19-showing temp relocation of jug rack)